5 Technical data
5.1.8
Note
To avoid measuring errors due to electromagnetic interference, the meter
housing must be grounded with the ground connection on the right section
of the housing (see Figure 16: Grounding the meter).
80
Minimum cable cross-section:
• length of up to 10 m:
• length of 10 m or higher: 10 mm²
In the process, a conductive connection between the TME 400 and the pipeline must
be provided as shown in the figure below.
Manual TME400-VMF · EN11 · January 22nd, 2024
Ground
Figure 16: Grounding the meter
6 mm²