3.4 Handling and Placement

Warning: The battery pile's power terminals has high DC voltage. It must be installed in
a restricted access area;
Warning: Force-H3 is a high voltage DC system, operated by qualified and authorized
personnel only.

3.4.1 Handling and Placement of the Battery Module

Warning: Single battery module is 39kg. The battery module must be handled by more
than 2 personnel if there're no handling tools.

3.4.2 Handling and Placement of the Base

The weight of the base is light, which a single person can handle with.

3.4.3 Requirements of Installation Site

A. Force-H3 system working temperature range: -10℃~55℃; Optimum temperature: 18℃~28℃.
DO NOT expose the battery system to direct sun light. It is suggested to build sunshade
equipment. In cold area a heating system is required.
B. Force-H3 system must not be immersed in water. The battery base cannot be exposed to rain
or other water sources. As a suggestion, the base's height shall be >300mm above the ground.
C. The support surface should have sufficient load capacity to support the weight of whole
battery system (130~300kg).
D. Force-H3 system bust be installed on a fixed and flat support surface.
NOTE,
The above illustration is just for reference. The quantity of the battery modules is based on
your practical system.