Pylontech Force-H3 Operation Manual page 38

Lithium phosphate energy storage system
Table of Contents

Advertisement

4. Mark the central points of the slotted holes at both sides on the wall.
Central point
5. Dismantle the brackets on both sides. Aligning the central points, drill two holes (≥60mm
depth) in the wall with a drilling tool, and clean the holes.
35

Advertisement

Table of Contents
loading

Table of Contents