Pylontech Force-H3 Operation Manual page 25

Lithium phosphate energy storage system
Table of Contents

Advertisement

For communication cables connection for PIN1~10 terminal station, please follow the steps below:
1. Dismantle the two screws from the
communication protection cover.
2. Unscrew the plastic nut from the cover.
3. Take out the rubber plug(s) from the
rubber pad.
NOTE,
After communication cables connection,
1. REMEMBER to install the rubber plugs back in the EMPTY holes of the rubber pad to
guarantee water resistance of the cover.
2. Screw the plastic nut back to the cover.
3. Install the two screws in the protection cover to fix it on the control module interface.
4. Insert the communication cable into the hole.
5. Follow the instructions of Pin 1~10 Assignment
Table, and insert the cable terminal into the
corresponding pin of the terminal plug.
* You can use a screwdriver as shown or your finger to
press the button.
22
*
After cables
connection,
Insert the terminal plug
into the terminal socket.
Press the button, insert
the cable terminal into the
corresponding hole. Then
release the button and the
cable is fixed in the hole.

Advertisement

Table of Contents
loading

Table of Contents