Chapter 2 Installing Your Product; Plugging In Signals; Plugging In Main Power; Turning On Your Product - RGBlink X3 User Manual

Hide thumbs Also See for X3:
Table of Contents

Advertisement

Chapter 2 Installing Your Product

2.1 Plugging in Signals

Connect signals to the product (ensure all the device are all power off first).Tighten connector
screws/locks where provided.

2.2 Plugging in Main Power

Connect IEC cable to device and plug into wall socket. Turn on power at wall socket.

2.3 Turning on Your Product

Turn on the power switch on the real panel.
OLED display will show as below,completing initialization before loading the latest settings and
input/output configuration.
12
X3
User Manual

Advertisement

Table of Contents
loading

Table of Contents