User Manual V1.1-2023-12-30
9 Maintenance
9.1 Power OFF the Inverter
• Power off the inverter before operations and maintenance. Otherwise, the inverter may be
damaged or electric shocks may occur.
• Delayed discharge. Wait until the components are discharged after power off.
Step 1: (Optional) Send a shutdown command to the inverter through SolarGo.
Step 2: Turn off the AC switch between the inverter and the utility grid.
Step 3: Turn off the DC switch of the inverter.
9.2 Removing the Inverter
• Make sure that the inverter is powered off.
• Wear proper PPE before any operations.
Step 1: Disconnect all the cables, including DC cables, AC cables, communication cables, the
communication module, and PE cables.
Step 2: Remove the inverter from the mounting plate.
Step 3: Remove the mounting plate.
Step 4: Store the inverter properly. Ensure that the storage conditions meet the requirements
for future use.
9.3 Disposing of the Inverter
If the inverter cannot work anymore, dispose of it according to the local disposal
requirements for electrical equipment waste. The inverter cannot be disposed of together
with household waste.
DANGER
WARNING
41
Maintenance