Maintenance; Power Off The Inverter; Removing The Inverter; Disposing Of The Inverter - Goodwe HT Series User Manual

Grid-tied pv inverter
Hide thumbs Also See for HT Series:
Table of Contents

Advertisement

09 Maintenance

9 Maintenance

9.1 Power Off the Inverter

• Power off the inverter before operations and maintenance. Otherwise, the inverter may be
damaged or electric shocks may occur.
• Delayed discharge. Wait until the components are discharged after power off.
Step 1 Issue a command to the inverter for halting the grid via SolarGo APP.
Step 2 Turn off the AC switch between the inverter and the utility grid.
Step 3 Turn off the DC switch of the inverter.

9.2 Removing the Inverter

• Make sure that the inverter is powered off.
• Wear proper PPE before any operations.
Step 1 Disconnect all the cables, including DC cables, AC cables, communication cables, the
communication module, and PE cables.
Step 2 Handle or hoist the inverter to take it down from the wall or the bracket.
Step 3 Store the inverter properly. If the inverter needs to be used later, ensure that the storage
conditions meet the requirements.

9.3 Disposing of the Inverter

If the inverter cannot work any more, dispose of it according to the local disposal requirements
for electrical equipment waste. Do not dispose of it as household waste.
DANGER
WARNING
40
User Manual V1.1-2023-12-14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gw250k-htGw250kn-htGw225k-htGw225kn-ht

Table of Contents