Goodwe XS Series User Manual page 24

Grid-tied pv inverter
Hide thumbs Also See for XS Series:
Table of Contents

Advertisement

Installation
Step 1: Put the plate on the wall or bracket horizontally and mark positions for drilling holes.
Step 2: Use an impact drill with a drill bit diameter of 8mm to drill holes, ensuring a depth of
approximately 60mm.
Step 3: Use the expansion bolts to fix the plate on the wall or bracket.
Step 4: (Australia only) Install DC switch lock.
Step 5: Install the inverter on the mounting plate.
Step 6: Fix mounting plate and inverter.
Step 7: Install the mounting plate lock.
Only for Australia.
User Manual V1.1-2023-12-30
φ:8mm
D:60mm
20

Advertisement

Table of Contents
loading

Table of Contents