  • Page 1 App Store Google Play SBP SERIES USER MANUAL AC-COUPLED INVERTER enquiries@goodwe.co.uk...
  • Page 2: Table Of Contents

    2.3 Special illustration 4.6 DRED Connection 4.7 Earth Fault Alarm 4.9 Special backup application 4.10 Special Adjustable Connection 6 CEI Auto Test introduction 9 Trouble shooting 13 Maintenance...
  • Page 3: Important Safety Warning

    Let it cool before touching it. The SBP series inverter of Jiangsu GoodWe Power Supply Technology Co. Ltd. (hereinafter referred to as GoodWe) strictly conforms to ● Ensure children are kept away from inverters.
  • Page 4: Special Illustration

    * Under battery temperature 40℃ , constant-voltage charge at 2.39*24=57.36V, float charge at 2.23*24=53.52V; For GoodWe S-BP inverters, it is able to supply a continuous 5000VA output or max 5500VA in less than 10 seconds on back-up side, Then battery working temperature should also be under consideration to set battery charge voltage, otherwise, battery will to support back-up loads.
  • Page 5: Product Overview

    3 Installation 3.2 Product Overview 3.1 Packing List Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the Battery input following items inside of package: 2. External Wi-Fi module 3. Meter&EMS communication port 4.
  • Page 6 single phase grid systems w ith single phase EzMeter, system connection diagram as below: 500mm 300mm 300mm 300mm Left & right 500 mm 500mm House Grid To Battery communication cable To EzMeter communication cable on both three phase grid systems w ith three phase EzMeter, system connection diagram as below:...
  • Page 7 Goodwe's product specification. inverter is safe to disconnect with a GW5000S-BP 6~8 N.m) GW3600S-BP Note: please to the left hand side of Figure 4.2.2-1. Single capacitive loadpower 1kVA,...
  • Page 8 PE line is longer than L and N. An earth wire terminal is set on the right side of the inverter. It shall be connected to earth wire.Refer to Figure 4.2-4. GoodWe's product specification. not in excess of 10 Ohm.
  • Page 9 For three phase grid systems with three phase EzMeter,please snip the "To EzMeter" communication cable,then EzMeter communication cable should be as per the installation diagram. ① House Grid ③ lithium battery ④ if constart blink, Inverter is on grid side connection ok.
  • Page 10: Dred Connection

    NOTE: Switch Board 6-pin terminal is used to make connection to DRED device. If DRED device is not available, please keep it not connected. Back-Up Loads Back-Up RS-485 Goodwe SBP series Main Battery Hybrid Inverter Switch Ezmeter Grid Link Grid 4.6-1...
  • Page 11 It is adjustable through special software ,if you want to use it ,please contact with after sales. Green Green ellow ellow The methods document of using the software can download from goodwe website or contact with after sales. INDICATOR STATUS EXPLANATION ON = SYSTEM IS READY...
  • Page 12: Trouble Shooting

    8 Work Modes 9 Trouble shooting SBP series inverters have the following main work modes based on different conditions: Q/A and Trouble Shooting on SBP PLEASE CHECK THE FOLLOWING ITEMS AT THE FIRST INSTALLATION, MAKE SURE EVERYTHING IS WORKING. OR PLEASE STOP INVERTER SYSTEM TILL EVERY THING CONFIRMED FINE OR CONTACT GOODWE.
  • Page 13 1. Check if there is a fluctuation on load power; connect Solar-Wifi, check on EzManage APP (Parameter >>> Big Power fluctuation on Battery 2. Check if there is a fluctuation on Meter power on GoodWe Portal. Battery) if Battery Mode is right for your requirements. If not right, charge/discharge If everything is OK, please contact GoodWe after-sales Services.
  • Page 14: Error Messages

    PV connected and then restart SBP till you see work mode as wait on APP. Fac Failure Grid frequency no longer within permissible range If all these steps do not help, please contact GoodWe services. Over Temperature Overtemperature on the case...
  • Page 15: Technical Parameters

    11 Technical Parameters Output THDv (linear load) <3% Efficiency Technical Data GW3600S-BP GW5000S-BP Max. Efficiency 95.5% Battery Input Data Protection Battery Type Li-Ion or Lead-acid Li-Ion or Lead-acid Anti-islanding Protection Integrated(AFD) Nominal Battery Voltage (V) Output Over Current Protection Integrated ≤60 (Configurable) Max.
  • Page 16 12 Certificates : Under off-grid mode, battery capacity should be more than 100 Ah. Under on-grid mode, battery capacity could be less than 100Ah. : 21.7A for AS4777.2 : Can be reached only if using Lead-acid batteries or Li-Ion batteries output power is greater than the load power, the inverter will shut down.