Hardware Installation Guide
2.2.9
Inspection of the Installation Unit
Regardless of whether the device is installed on the wall or ceiling, the following
conditions must be met:
Maintain sufficient clearance around the air vents of the device for heat dissipation.
The installation site allows for proper cooling and ventilation. Install air conditioners in
hot areas.
The installation side is sturdy enough to support the weight of the device and its
accessories.
2.3
Tools
Table 2-3
Tools
Common
Tools
Special
Tools
Meter
Relevant
Devices
Note
RG-MAP852-SF-U is not delivered with a tool kit. You need to prepare a tool kit by
yourself.
Phillips screwdrivers, wires, network cables, fastening bolts, diagonal
pliers, binding straps, and fiber splicing equipment
ESD gloves, wire stripper, crimping pliers, RJ45 crimping pliers, wire
cutter, shrink tube, and LC patch cord
Multimeter and bit error rate tester (BERT)
PC, display, and keyboard
17
Preparing for Installation