Aerotech Ensemble CL Hardware Manual page 27

Table of Contents

Advertisement

Installation and Configuration
CL
AC1
CT
AC2
3
AC1
AC2
CL
AC1
CT
AC2
3
AC1
AC2
HAZARDOUS VOLTAGES PRESENT
1. For 100 VAC primary input, parallel the 100 VAC taps and leave the 115 VAC taps unterminated.
2. For 200 VAC primary input, series the 100 VAC taps and leave the 115 VAC taps unterminated.
3. It is recommended that the control and motor supplies are connected to the same source as shown.
This will ensure proper soft start circuit operation.
4. Transformer Primary Wiring: 0.8 mm
5. Transformer Secondary Wiring: 0.5 mm
Figure 2-4:
www.aerotech.com
Integral Fuse
3.15A Slow-Blow
F1-IN
Internal
Thermal
5
Switch
F1-OUT
28V
115V
100V
0V
0V
115V
28V
100V
0V
0V
115 VAC INPUT
Integral Fuse
3.15A Slow-Blow
F1-IN
Internal
Thermal
5
F1-OUT
Switch
28V
115V
100V
0V
0V
115V
28V
100V
0V
0V
230 VAC INPUT
CONNECT ALL WIRING BEFORE
POWERING TRANSFORMER
(#18 AWG) 300 V wire.
2
(#20 AWG) 300 V wire.
2
40 VDC Motor Power with a TV0.3-28-56-ST Transformer
Chapter 2
AC HI
AC LO
SAFETY
Frame Ground
Secondary = Dual 28 VAC (±40 VDC Bus)
AC HI
AC LO
SAFETY
Frame Ground
Secondary = Dual 28 VAC (±40 VDC Bus)
FOLLOW ALL APPLICABLE WIRING
AND SAFETY CODES.
Ensemble CL
115 VAC
50/60 HZ
INPUT
230 VAC
50/60 HZ
INPUT
13

Advertisement

Table of Contents
loading

Table of Contents