Installation Manual
Comms > Comms Test >

Test Report Period

0 = No Test Report
1 = Every Day
2 = Every Week
3 = Every Month
This menu programs how often the control panel will send a
test report. Only one option can be programmed.
(*** System Wide Parameter ***)
1)
Press [MENU] + [5] + [9] + [2]. The keypad will display the
current Test Report Period.
Test Report Period
01 - Every Day
Press  0-9 OK to SAVE
2)
Use the up and down arrow keys to select the Test Report
Period then Press [OK] to save and exit or press [MENU] to exit
without saving.
Comms > Comms Test >

Test Report Options

1

Send Test Reports Only If No Other Report

2

Send Test Reports On Audible Time Out

3
Reserved
4
Reserved
5
Reserved
6
Reserved
7
Reserved
8
Reserved
1)
3Press [MENU] + [5] + [9] + [3]. The keypad will display the
current Test Report Options.
Test if No other Report
 Test On Siren Reset
Reserved
Press  OK ON OFF MENU
2)
Use the up and down arrow keys to highlight the option then
press the [ON] key to enable or the [OFF] key to disable.
3)
Repeat Step 2 until all options are programmed as required,
then press [OK] to save and exit or press [MENU] to exit
without saving.
Send Test Reports Only If No Other Report
Setting this option will cause the system to only send its automatic
Test report if no other area report has been sent within the test report
time period as programmed in MENU 5-9-2.
Send Test Reports On Audible Time Out
Setting this option will delay the Automatic Test Report if the sirens
are running when the test report time expires. This effectively keeps
the telco line free to make any further alarm reports which may be
triggered while the sirens are running. The panel will send the cued
Test Report as soon as the siren run-time has expired.
9-14
Comms Programming
MENU 5-9-2
1
MENU 5-9-3
N
Y
N
N
N
N
N
N
Comms > Comms Test >

Test Route

0 = Report Events To Log Only
1 = Report Events To Destination 1 + Log
2 = Report Events To Destination 2 + Log
3 = Report Events To Destination 1 & Destination 2 + Log
4 = Report Events To Destination 2 If Destination 1 Fails + Log
This menu programs which destination will be used to send
both manual and automatic test reports.
(*** System Wide Parameter ***)
1)
Press [MENU] + [5] + [9] + [4]. The keypad will display the
current Test Route.
Test Route
01 - Dest 1 + Log
Press  0-9 OK to SAVE
2)
Use the up and down arrow keys to select the Test Route
required then Press [OK] to save and exit or press [MENU] to
exit without saving.
Comms > Comms Test >

Dial Number Test

This option provides a quick and easy way for the Installer to
test the communication path for the panel while they are
onsite without the need to trigger test reports and then verify
them with the base station. Once the telco wiring has been
completed, enter your mobile phone or another test number
into this location and press [OK]. The panel will then seize the
phone line and dial the programmed number.
Press [MENU] + [5] + [9] + [5].
1)
Use the numeric keys to enter the the test number. You can
2)
change a single digit in the number by scrolling the cursor left
or right. For special characters (eg. , = pause * or # etc), use the
up and down arrow keys. To clear all text from the cursor
position to the right, press the [OFF] key.
Enter Digits To Dial
Press  0-9 OK to SAVE
3)
Press [OK] when finished to start the test.
i
The panel will make only one attempt to call this number per
activation. To perform multiple tests repeat the sequence. There
is no need to answer the test call.
Note
» » E N D