Download Print this page

Rancilio Silvia PID Kit Manual page 54

Advertisement

Silvia PID Installation Guide
Part S
Version 96-1.01
This is the "hot" side of the steam switch, as indicated by the black wires connected to
the tab immediately below the empty tab. Polarity of these wires is important to the
proper function of the coil in the relay. So be sure to connect the brown wire as shown.
Step S4 – Connect purple wire to the "neutral" side of
the steam switch
In order to complete the wiring modifications at the steam switch, it will probably be
necessary to rotate the cover on to its left side. Place a soft cloth directly on the top of
the exposed brew group. Then carefully rotate the cover until it can be laid on its left
side on this soft cloth. See photo below.
S-5
Copyright © 2006, 2008 MLG Properties, LLC

Advertisement

loading