Download Print this page

Rancilio Silvia PID Kit Manual page 27

Advertisement

Silvia PID Installation Guide
Part A
Version 2.04
Place a small amount of white thermal paste (included in your kit) where the
thermocouple will be in contact with the top of the boiler. This will improve the response
of the thermocouple.
You may place the grease directly on the boiler (see photos below), on the
thermocouple's ring, or on both. If the top of the boiler on your machine is dirty, we
recommend that you clean it with a rag and water to improve the thermal contact.
Copyright © 2006, 2008 MLG Properties, LLC
Page A-23

Advertisement

loading