Download Print this page

Rancilio Silvia PID Kit Manual page 25

Advertisement

Silvia PID Installation Guide
Part A
Version 2.04
Pull the free ends of these wires toward the rear of the machine (right next to the low
voltage DC control wires installed in previous step).
Note: Some of our kits use
controllers for which the
polarity of the power supply
wires is important. If your
kit includes one of these
controllers, then you will
only have one (1) black wire,
plus one (1) gray wire. In
this case, place the black
wire on the left side (see
photo at right). The left side
is the so-called "hot" side and
corresponds with the location
of the black wires in the
original Silvia wiring. Place
the gray wire on the right side. The right side is the "neutral" side and corresponds with
the location of the red wires in the original wiring shown in these photos.
Step A15 – Install thermocouple
In this step, you are going to install your
thermocouple on the top surface of Silvia's boiler.
Your kit contains a type T thermocouple, with a
ring terminal on the business end to facilitate
connection. This thermocouple was custom made
from SLE (special limits of error) wire and will be
highly accurate.
Copyright © 2006, 2008 MLG Properties, LLC
Page A-21

Advertisement

loading