Proline Promass I 300 PROFINET
Endress+Hauser
10
Commissioning
10.1
Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 30
• "Post-connection check" checklist → 48
10.2
Switching on the measuring device
‣
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 155.
10.3
Connecting via FieldCare
• For FieldCare → 70 connection
• For connecting via FieldCare → 72
• For the FieldCare → 73 user interface
10.4
Setting the operating language
Factory setting: English or ordered local language
X X X X X X X
X
XX
Main menu
1.
2.
3.
4.
25
Taking the example of the local display
X
20.50
XX
0104-1
Display language
English
Operation
Setup
Display language
English
Ã
Deutsch
Español
Français
Display language
Ã
English
Deutsch
Español
Français
Commissioning
0104-1
0104-1
Hauptmenü
0104-1
Sprache
Deutsch
Betrieb
Setup
A0029420
91
Need help?
Do you have a question about the Proline Promass I 300 PROFINET and is the answer not in the manual?
Questions and answers