Nova430e Outdoor 4x250mW Two-Carrier TDD eNodeB Installation Guide
3.3.2 Install on Wall
Ensure that the wall can bear at least four times the weight of the eNB. Follow the steps below to install
the Nova430e eNB on a wall.
1. Take apart the assembled pole/wall bracket so that only the wall bracket remains.
2. Place the wall bracket on the wall with the arrow facing up, as shown in
Figure 3-9. Mark the drilling locations using a pencil or marker.
3. Drill two holes in the wall to match the size of the wall bracket holes.
Figure 3-9: Mark and Drill Holes
4. Insert the expansion bolts in the marked location. Check the up/down direction of the installation
bracket, and then hang the wall bracket on the expansion bolts. Fasten with flat washers, spring
washers, and nuts (Figure 3-10).
Figure 3-10: Attach With Expansion Bolts
20