Nova430e Outdoor 4x250mW Two-Carrier TDD eNodeB Installation Guide
3. Align the two pins on the eNB bracket to the pin holes on the pole bracket, and lower the pins
vertically into the pin holes, ensuring the hooks on the eNB are firmly attached in the slots on the
pole bracket (Figure 3-7).
Figure 3-7: Attach eNB to Bracket
4. Tighten the screw on the top of the bracket using a Phillips-head screwdriver to complete the
installation (Figure 3-8).
Figure 3-8: Completed Attachment
5. Proceed to
section
3.4.
19