Nova430i Outdoor 4x250mW Two-Carrier TDD eNodeB Installation Guide
3.2.2 Install on Wall
Ensure that the wall can bear at least four times the weight of the eNB. Follow the steps below to install
the Nova430i eNB on a wall.
1. Remove the omega clamps from the pole/wall bracket so that only the wall bracket remains
(Figure 3-7).
2. Place the wall bracket on the wall with the arrow facing upward, as shown in
Figure 3-7. Mark the drilling locations using a pencil or marker.
3. Drill two holes in the wall to match the size of the wall bracket holes (Figure 3-7).
Figure 3-7: Mark and Drill Holes
4. Install expansion bolts in the marked locations. Check the up/down direction of the wall bracket,
and then hang the wall bracket on the expansion bolts. Tighten using flat washers, spring washers,
and nuts (Figure 3-8).
Figure 3-8: Attach With Expansion Bolts
17