Figure 21: Fix Bracket To Wall; Figure 22: Attach Cpe; Figure 23: Mark Holes For Drilling - Baicells Atom OD040615 User Manual

Low-gain & high-gain cpe
Table of Contents

Advertisement

Figure 21: Fix Bracket to Wall

a4) Attach the CPE to the bracket and tighten the screw (Figure 22).

Figure 22: Attach CPE

a5)
Proceed to
b. High-Gain CPE:
b1) Put the bracket up to the wall and mark the drilling locations (Figure 23).

Figure 23: Mark Holes for Drilling

b2) Drill two 0.5 in. (12 mm) diameter and 3.1 in. (80 mm ) d epth holes at the marked
locations on the wall.
b3) Tap the expansion bolts into the holes with a hammer.
b4) Install the bracket on the expansion and tighten the screws.
b5) Attached the CPE to the bracket and tighten the screws (Figure 24).
section
7.
19

Advertisement

Table of Contents
loading

Table of Contents