Nova230i Outdoor 2x500 mW eNodeB Installation Guide
3. Assemble the clamp and tighten the screws (Figure 3-4).

Figure 3-4: Tighten Screws

3.2.2 Install on Wall

Ensure that the wall can bear at least four times the weight of the eNB. Follow the steps below to
install the Nova230i eNB on a wall.
1. Take apart the assembled installation bracket.
2. Place the device against the wall mounting bracket on the wall. Mark the drilling locations
using a pencil or marker.
3. Drill two holes measuring 0.4 in (10 mm) diameter by 2.8 in (70 mm) deep on the wall to
match the size of the wall bracket holes (Figure 3-5).

Figure 3-5: Mark and Drill Holes