Figure 14: Rubber Band; Figure 15: Bracket; Figure 16: Attach Cpe; Figure 17: Tighten Screws - Baicells Atom OD040615 User Manual

Low-gain & high-gain cpe
Table of Contents

Advertisement

9. Pole installation:
a. Low-Gain CPE:
a1)
Attach a heavy-duty anti-slip rubber band on the pole (Figure 14).

Figure 14: Rubber Band

a2)
Fix the CPE bracket over the band using the hoop (Figure 15).

Figure 15: Bracket

a3)
Attach the CPE to the bracket and tighten the screw (Figure 16).

Figure 16: Attach CPE

a4)
b. High-Gain CPE:
b1)
Tighten the four M6 screws on the bottom of the bracket (Figure 17).

Figure 17: Tighten Screws

The CPE is now ready for installation at its final outside location. Proceed to
section
7.
17

Advertisement

Table of Contents
loading

Table of Contents