Verifying Operating Status; Establishing The Configuration Environment; Powering On The Ap; Checklist Before Power-On - Ruijie RG-AP680-IO Hardware Installation And Reference Manual

Table of Contents

Advertisement

Hardware Installation and Reference Guide
4

Verifying Operating Status

4.1

Establishing the Configuration Environment

Power on the AP through PoE.
When setting up the environment, pay attention to the following:
Verify that the AP is properly connected to the power source.
Connect the AP to an AC through a twisted pair cable.
When the AP is connected with a PC, verify that the PC and PoE switch are properly
grounded.
4.2

Powering on the AP

4.2.1

Checklist Before Power-on

Check whether the power cord is properly connected.
Check whether the power supply voltage is the same as that required by the AP.
4.2.2

Checking the Environment After Power-on

After power-on, you are advised to check the following to ensure the normal operation of
the AP:
Check if any message is printed on the configuration interface of the device.
Check whether the LEDs are normal.
34
Verifying Operating Status

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-AP680-IO and is the answer not in the manual?

Questions and answers

Table of Contents