8. Operating Test

8.1 LED Indications

As shown in the [Figure 8-1], the LED of Q.HOME
The color of LED depend on current status of INVERTER and LED display information can be checked
in [Table 8-1].
OFF
Energy is not being generated.
Green
Energy is being generated.
Red
Fault

8.2 Starting the System

After completing the installation, turn on the AC circuit breaker installed in the distribution box and then
turn on the DC disconnect switch on the product.
Check the system check message on the front LCD screen.
8.2.1 Loading Screen & Update Screen
The [Figure 8-2] is displayed at the time of initial boot, and the home screen is displayed when
internal communication is normal. The time setting is automatically renewed when connected
to the network. The [Figure 8-3] is a screen display when ESS Software (PMS & PCS) is updated.
[ Figure 8-2 : Initial Indication Screen on Power On ]
69
I
Operating Test
ESS HYB-G2 is located at bottom of LCD.
+
[ Figure 8-1 : LCD Location ]
Solar (A)
Battery is not connected.
Battery is connected.
Fault
[ Table 8-1 : LED Indications ]
A
B
C
Battery (B)
Grid is not connected.
Grid is connected.
Fault
[ Figure 8-3 : Update Screen ]
Grid (C)