Mounting Instructions - Q CELLS Q.VOLT-G2 HYB-4.6kW.1.1 Installation Manual

Hide thumbs Also See for Q.VOLT-G2 HYB-4.6kW.1.1:
Table of Contents

Advertisement

4.2 Mounting Instructions

CAUTION
There is risk of injury if the ESS is lifted incorrectly or dropped while being transported
or when attaching it to or removing it from the wall mounting bracket.
Transport and lift the ESS carefully.
It is important to ensure the drilling locations are not located on any electrical wiring
within the wall.
This product must be installed on the wall considering appropriate environments described in previous
pages. Follow the mounting instruction described below exactly and securely.
* NOTE
When attaching the wall bracket to a wall, adjust the horizontal level using inclinometer.
STEP 1
• Step 1 : Mark guideline on wall.
- Drill hole : size = Ø10 / Length = 45-55 mm
- Upper bracket : 3 EA
- Lower bracket : 2 EA
208.5 mm
150 mm
Wall Mount Screw
GND Screw
208.5 mm
150 mm
[ Figure 4-4 : Bracket on the Wall in Step 1, 2 ]
Diameter
M8
M4
[ Table 4-1 : Screw Specification ]
STEP 2
• Step 2 : Get ready for the upper bracket.
- Step 2-1 : Detach Anchor bolt.
- Step 2-2 : Insert the Anchor bolt into the bracket.
STEP 2-1
STEP 2-2
L
45 mm
8 mm
Touque
20 kgf
10 kgf
I
22
Installation

Advertisement

Table of Contents
loading

Table of Contents