An Installation Method Of Energy Meter Electrical Connection - Q CELLS Q.VOLT-G2 HYB-4.6kW.1.1 Installation Manual

Hide thumbs Also See for Q.VOLT-G2 HYB-4.6kW.1.1:
Table of Contents

Advertisement

5.8 An Installation Method of Energy Meter Electrical Connection

The electrical installation method of the digital energy meter (energy meter) must comply with installation
method provided by the digital energy meter manufacturer. However, the digital energy meter must be
selected.
The [Figure 5-15] shows the electrical cable connection and the communication lines of the digital energy
meter. Refer to the [Figure 5-20] and the communication description in Chapter 6 to install the digital
energy meter.
Battery
Power
PV Input
Power
[ Figure 5-20 : Electric Cable Connection for Energy Meter Installation ]
The end system of the used lead wiring may be different with the energy meter chosen.
Therefore, refer to the energy meter manual.
41
I
Electrical Connections
Grid Output
Power
Load Output
Power(Sub)
Energy
Meter for
Utility
Load Output
Power(Main)

Advertisement

Table of Contents
loading

Table of Contents