DOCUMENT REVISION 02 This Manual is valid for Africa, Asia, Europe, Latin America and South America as of October 1st 2020 for Q.PEAK DUO ML-G9.4 solar modules, and replaces all earlier versions. This manual is subject to change. The data sheets and customer information valid at the point in time when the relevant module was manufactured apply to the installation, mounting, and maintenance procedures for the respective solar modules, as far as no updated document is provided.
32 mm 8.5 mm 24.5 mm Fig. 1: External dimensions and components for Q.PEAK DUO ML-G9.4 INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS...
Fig. 2: Forces acting on the module are relayed to the mounting Installation options for crystalline Q CELLS modules. All dimensions are given in mm. Also observe the maximum Please note the following guidelines that apply to the installation substructure.
Page 5
PUSH / PULL** [PA] PUSH / PULL** [PA] FACTOR system including clamps has to be evaluated by the system supplier. The listed test load values for Q CELLS were determined Q.PEAK DUO ML-G9.4 CL1a 150 - 450 with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm. The system installer is responsible for...
Ä Store the modules securely in cool and dry rooms. The packaging is not weatherproof. INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS...
Ä Do not install modules in close proximity to air lation. conditioning systems. INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS...
Only use dry, insulated tools for electrical Ä Insulate any exposed cable ends. work. Only connect cables with plugs. Ä INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS...
Inverter click 180° 180° INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS...
Ä Modules must be cleaned manually and only and mechanical friction. with sufficient water. INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS...
Do not let IPA run down between the module and the frame or into the module edges. INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO ML-G9.4 – Q CELLS...