5.6 Connection Method between Grid and Load

CAUTION
Any failure of the INVERTER when it is not connected to ground through the appropriate
terminal is not covered by the warranty.

5.6.1 Feature and Size of Cable

The following lists the insulation strip length details for each conductor cross section.
Refer to Chapter 5.1.2 for cable specification. The ground wire should be grounded by crimping the ring
terminal. Refer to Chapter 2.4.5 for work on ring terminal.
Type
Grid
Load
Battery
37
I
Electrical Connections
Strip Length
PE = 120 mm
L = N = 210 mm
PE = 115 mm
L = N = 230 mm
PE = 150 mm
L = N = 170 mm
[ Table 5-8 : Insulation Strip Lengths ]
7-8 mm
PE
9 mm
//
L
9 mm
//
N
7-8 mm
PE
9 mm
//
L
9 mm
//
N
7-8 mm
PE
9 mm
//
9 mm
//