5.3 Battery Connections

CAUTION
• Make sure the AC circuit breaker, PV switch and DC circuit breaker of the Battery are
disconnected before starting electrical cable connections.
• Battery replacement can only be carried out by qualified personnel. If the Battery needs
to be changed, it should be placed with a product which meets the manufacturer's
specifications.
• Do not mismatch the connection of the electric poles (+) to (-) and (-) to (+) when
installing. It may cause electric shock or the product may permanently be damaged.
• Incorrect Battery polarity connection will damage the product seriously.
This damage is not covered by the warranty.
• All other connections should be done defore Battery assembly and the Battery
interrupter must be off.
You can connect a Battery to this product. The electricity generated from the connected PV array will be
stored in the Battery. Before connecting the Battery to this product, install the Battery on the place where
the Battery cables are easily accessible to this product.
1. Open the bottom cover of INVERTER and Battery case.