7.3.5 Battery Installation Process with HMI

Please check the LCD screen on top cover of PCS. Follow the instruction below for battery communication.
1
6
Step 1 )
Touch Battery Icon 10 times.
Step 2 )
Select. [Initial ID]
2
Step 3 )
3
Click Next Button.
Step 4 )
• All Battery Pack Communication Cables are
Step 5 )
5
Click Next Button.
Step 6 )
Check Initialization Success Message.
• If there is Failure Message, Click Stop Button
and Check Communication Line.
Go to Step 2. [Initial ID]
Step 7 )
7
Click Finish Button when Initialization is successful.
Connected. Open circuit breakers.