Fayat Group CP1200 Instruction Manual page 37

Table of Contents

Advertisement

3
Fig. – The control and operation unit
1. Locking lever - transverse travel
2. Locking lever - rotation
3. Locking lever - steering column angle
08/01/2023
Operation - Before starting
Daily maintenance
Before starting your work shift and operating the
equipment, make sure the daily maintenance
was carried out. For further information, refer to
the maintenance section in this manual.
Battery switch
Check if the Battery switch is on. The Battery switch is located
in the electric device compartment (1) on the left side of the
machine.
After the daily use of the roller, the Battery switch shall
be turned off. It prevents the machine to be turned on
accidentally and protects the electronic devices.
If the main battery switch is closed, the engine
hood shall be opened during the operation to
make it possible to reach in an emergency.
The control and operation unit
The control and operation unit has three adjustment options:
transverse travel, rotation and steering column angle.
For transverse travel, raise the inner lever (1). The transverse
travel brake will be released.
For rotation, raise the outer lever (2). Make sure the control unit
2
is in the correct position before operating the machine.
For steering column angle, release the locking lever (3). Fix it
again in the new position.
1
To adjust the operator's seat, refer to the next section.
Perform all the control and operation unit
adjustments when the machine is stationary.
Before starting your work shift and operating the
machine, make sure the seat and the steering
column are locked and never release the side
travel if you are on a slope.
4812325556EN
Operation - Before starting
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cp1200w

Table of Contents