Propane Fuel Filter Replacement (Gm Engine) - JLG 800S Operation & Safety Manual

Hide thumbs Also See for 800S:
Table of Contents

Advertisement

General Specifications and Operator Maintenance
3. The tightening of the nuts should be done in stages. Following the recommended
sequence, tighten nuts per wheel torque chart.
1st Stage
70 ft. lbs.
(95 Nm)
4. Wheel nuts should be torqued after first 50 hours of operation and after each
wheel removal. Check torque every 3 months or 150 hours of operation.

7.13 PROPANE FUEL FILTER REPLACEMENT (GM ENGINE)

1. Electric Lock Off Solenoid
2. Housing Seal
3. Filter Magnet
4. Filter Housing
7.13.1
Removal
1. Relieve the propane fuel system pressure. Refer to Propane Fuel System Pressure
Relief.
2. Disconnect the negative battery cable.
3. Slowly loosen the filter housing and remove it.
4. Pull the filter housing from the electric lock off assembly.
5. Remove the filter from the housing.
156
Table 16. Wheel Torque Chart
TORQUE SEQUENCE
1
10
2
3
4
Figure 49. Filter Lock Assembly
5. Electrical Connector
6. Fuel Outlet
7. O-ring
31222372
2nd Stage
170 ft. lbs.
(225 Nm)
6
7
8
BM000150A
9
8. Filter
9. Fuel Inlet
10. Ring
3rd Stage
300 ft. lbs.
(405 Nm)
5
800S, 860SJ