User Responsibilities, Machine Preparation, and Inspection
8. Mid Boom Section
9. Fly Boom Section
2.4

PRE-START INSPECTION

The Pre-Start Inspection should include each of the following:
1. Cleanliness — Check all surfaces for leakage (oil, fuel, or battery fluid) or foreign
objects. Report any leakage to the proper maintenance personnel.
2. Structure — Inspect the machine structure for dents, damage, weld or parent
metal cracks or other discrepancies.
Figure 2. Parent Metal Crack
3. Decals and Placards — Check all for cleanliness and legibility. Make sure none of
the decals and placards are missing. Make sure all illegible decals and placards are
cleaned or replaced.
4. Operation and Safety Manuals — Make sure a copy of the Operation & Safety
Manual, AEM Safety Manual (ANSI markets only), and ANSI Manual of
Responsibilities (ANSI markets only) are enclosed in the weather resistant storage
container.
5. Walk-Around Inspection — Perform as instructed.
6. Battery — Charge as required.
7. Fuel (Combustion Engine Powered Machines) — Add the proper fuel as
necessary.
8. Engine Oil Supply — Ensure the engine oil level is at the Full mark on the
dipstick and the filler cap is secure.
9. Hydraulic Oil — Check the hydraulic oil level. Ensure hydraulic oil is added as
required.
10. Accessories/Attachments — Refer to the Accessories section in this manual or
accessory installed upon the machine for specific inspection, operation, and
maintenance instructions.
30
31222372
Figure 3. Weld Crack
800S, 860SJ