Platform Rails Fold-Down Procedure (If Equipped) - JLG ES1330L Operation & Safety Manual

Table of Contents

Advertisement

Machine Controls, Indicators, and Operation
3.13 PLATFORM RAILS FOLD-DOWN PROCEDURE (IF
EQUIPPED)
3.13.1
Platform with Dual Rail Extension Deck
Only fold down the rails when the machine is in the stowed (platform fully lowered)
position. Do not raise the platform with the rails folded down. The rails must be in
the upright position and properly pinned when raising the platform.
1. Remove platform control box and place on platform deck.
2. Remove two pins at the top front rails, then fold down the front rail panel to the
platform floor.
3. Fold down inner extension rails to the platform floor. Remove rail pin at top rear
rail and fold in against the right side top rail.
4. Fold down outer platform rails towards the platform floor
To raise rails back to the upright position, unfold the rails in the reverse sequence they
were folded and replace the rail pins into the rails.
After the rails have been folded down, use extreme caution when exiting and
entering the platform. Enter and exit platform only at the gate area and ladder
provided.
54
WARNING
WARNING
31221553
ES1330L, ES1530L

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es1530l

Table of Contents