JLG ES1330L Operation & Safety Manual page 38

Table of Contents

Advertisement

Machine Controls, Indicators, and Operation
1. Connect the charger AC input plug to a grounded outlet using a 3 wire heavy
duty extension cord.
2. After connecting the charger to an AC outlet at the start of the charging cycle,
verify normal operation of the LED indicators on the charger. Refer to
more information.
Note: Current battery charge state can also be seen on the platform control sta-
tion panel LEDs or the MDI indicator (if equipped) on the ground control
station when machine is powered up.
3. The batteries are fully charged when all three green LED indicators on the
platform control station or MDI battery charger status panel are illuminated.
Note: If the charger is left plugged in, the charger will automatically restart a com-
plete charge cycle if the battery voltage drops below a minimum voltage, or
if 30 days has elapsed.
38
31221553
, page 39
for
ES1330L, ES1530L

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es1530l

Table of Contents