COMMISSIONING

9. COMMISSIONING

9.1. Checking Before Power-On

No.
Check Item
Mounting
1
environment
Expandable battery
2
pack and Smile-
S5/B5 mounting
3
WiFi mounting
4
Cable layout
5
Cable tie
6
Grounding
Switch and breakers
7
status
8
Cable connections
Unused power
9
terminals

9.2. Powering on the Product

Check the voltage range and frequency range of the grid and the installation of
CT(s) or meter(s).
Switch on the battery breaker of the battery.
Switch on the battery breaker located on the energy storage inverter.
Switch on the external AC breaker between the grid and the energy storage
inverter.
Firstly, don't press the battery button, don't switch on the PV switch on the
energy storage inverter (if there is any) and don't switch on the AC breaker on the
PV inverter if there is any.
Acceptance Criteria
The mounting space is proper, and the mounting
environment is clean and tidy, without foreign object.
The expandable battery pack and Smile-S5/B5 are
mounted correctly, securely, and reliably.
The WiFi module is mounted correctly, securely, and
reliably
Cables are routed properly as required by the
customer.
Cable ties are secured evenly and no burr exists.
The grounding cable is connected correctly, securely,
and reliably.
The PV switch if there is any and battery breakers and
all the breakers connecting to the product are OFF.
The AC cable, PV cable (if there is any), battery cable,
and communication cables are connected correctly,
securely, and reliably.
Unused power terminals are blocked by watertight
caps.