Alpha ESS SMILE-S5 Manual page 44

Energy storage system
Hide thumbs Also See for SMILE-S5:
Table of Contents

Advertisement

43
Electrical Connection
1. DTSU666-3*230V 5(80)A: Three-phase meter (without CT)
When the meter is used as Grid meter, please follow the steps below to complete the
address setting.
When the meter is used as PV meter, please follow the steps below to complete the
address setting.
2. DTSU666-3*230V 100A/40mA, DTSU666-3*230V 250A/50mA: Three-phase meter
(with CT)
Please follow the steps below to complete the address setting.
Meter Setting on AlphaCloud
Step 1:
When the system work mode is selected as DC, click the button under the "Grid
Meter" to turn the "Meter" icon green.
When the system work mode is selected as AC or Hybrid, click the buttons under the
"Grid Meter" and "PV side meter" to turn the "Meter" green.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smile-b5

Table of Contents