Product Introduction and Application Scenarios
4
5
6
7
8
9
10
11
12
13
14
15
*All breakers of the product are switched off when shipped.
**The DRM is only for regions with AS/NZW 4777.2 safety regulations.
***For product B5, there are no PV switch and PV inputs.
The following table is about DRM interface definition, only for Australia.
Mode
DRM0
Operate the disconnection device
DRM1
Do not consume power
DRM2
Do not consume at more than 50% of rate power
Do not consume at more than 75% of rate power AND Source
DRM3
reactive power if capable
Increase power consumption (subject to constraints from other
DRM4
active DRMs)
DRM5
Do not generate power
DRM6
Do not generate at more than 50% of rate power
Do not generate at more than 75% of rate power AND Sink
DRM7
reactive power if capable
Increase power generation (subject to constraints from other
DRM8
active DRMs)
Communication Ports ( CAN/RS485,BMS, LAN, Meter/Grid-CT,
Battery Breaker* of the Inverter
Battery Breaker of the Battery Pack *
Battery+ Power Connector
PV Connectors***
DRM**, PV-CT, AUX )
Backup Connector
Grid Connector
Inverter LED Display
Battery LED Display
Battery Power Button
Battery- Power Connector
BMS COM Ports
Requirement