PCE Instruments PCE-360-ICA Instruction Manual page 37

Power analyzer
Table of Contents

Advertisement

3. Connect the voltage test leads and current probe to the meter.
 Connect the black voltage test lead to the "N" terminal.
 Connect the red voltage test lead to the "U1" terminal.
 Connect the yellow voltage test lead to the "U2" terminal.
 Connect the I1 current probe output plug to the "I1" jack.
 Connect the I2 current probe output plug to the "I2" jack.
 If you want to measure ground leakage current, connect the I4 current
probe output plug to the "I4" jack.
4. Connect the voltage test leads and current probe to the electrical
equipment to be tested
If possible, before connecting the voltage test leads and current probe
to the electrical equipment to be tested, take off the electrical
equipment's power.
 Connect the black voltage test alligator to the neutral line "N".
 Connect the red voltage test alligator to the line "A".
 Connect the yellow voltage test alligator to the line "B".
 Press I1 current probe trigger to open the jaw and fully enclose the Line
"A".
11
Press I2 current probe trigger to open the jaw and fully enclose the Line
"B".
User Manual
.
CAUTION

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pce-360

Table of Contents