A: Line, N: Neutral, G: Ground, ➔ Face the arrow toward the load.
1. Press
key to turn on the meter.
2. Press "WIRING" key to select the 1P2W electrical system under test, the
"1P2W" annunciator will be displayed.
3. Connect the voltage test leads and current probe to the meter.
 Connect the black voltage test lead to the "N" terminal.
 Connect the red voltage test lead to the "U1" terminal.
 Connect the I1 current probe output plug to the "I1" jack.
 If you want to measure ground leakage current, connect the I4 current
probe output plug to the "I4" jack.
4. Connect the voltage test leads and current probe to the electrical
equipment to be tested.
User Manual
I1
I2
I3
I4
1P2W Wiring Connection Diagram
U1
U2
U3
?
N