Stretching Wheel Replacement - Bomar Workline 410.280 DG Operating Instructions Manual

Table of Contents

Advertisement

4.10.4.
52
 
6.
Change all bearings and other worn parts.
7.
Install eccentrics to the cubes. Install components on both eccentrics in given
order. Put bearings by means of the preparation on eccentrics.
ATTENTION!
Do not replace the eccentrics placing in the cube
8.
Screw on nuts on both eccentrics and tighten them.
9.
Insert the saw band to the guiding cube (ca. 15 – 20 cm). Set the eccentrics by
means of the wrenches, the saw band must run in the centre. Guide pulleys must
not press too much on the band, but must spin freely during the band run.
10. Tighten nuts on both eccentrics.
11. Remove the testing piece of saw band from the cube lead. Install the guiding cube
on the machine and connect the pressure regulation to the cut and cooling. Install
the saw band.

Stretching wheel replacement

1.
Dismantle the saw band.
 
Manual version:
1.02 / Nov. 2011
Manual rev.:
1

Advertisement

Table of Contents
loading

Table of Contents