3: Service Setups - Christie CP4230 Service Manual

Hide thumbs Also See for CP4230:
Table of Contents

Advertisement

3 Service Setups
This section describes special internal hardware and software adjustments and related details that may require
the attention of a qualified service technician, whether done periodically or after a specific module
replacement. The following table lists the most common alignment procedures required after a specific part is
replaced.
Table 3.1 Alignments/Procedures
Part Description
Ceramic Plate (on Douser blade)
Cold Mirror
Douser Motor
Fold Mirror
Illumination Optics System (IOS)
Integrator Assembly
Lamp
Lamp Power Supply (LPS)
Lens Mount Kit (Motorized or Non-
Motorized)
Light Engine
Reflectors, 12" Glass
UV Filter
Vane Switch (Exhaust)
Yellow Notch Filter
CP4230 Service Manual
020-100622-04 Rev. 1(05-2016)
Required Alignments/Procedures
• Adjust LampLOC
• Adjust LampLOC
• Recalibrate Measured Color Gamut Data (MCGD)
• Adjust LampLOC
• Adjust Fold Mirror alignment
• Adjust Yellow Notch Filter
• Recalibrate color
• Define footlamberts (optional)
• Integrator alignment
• Fold Mirror alignment
• Adjust LampLOC
• Adjust LampLOC
• Boresight adjustment
• Recalibrate color
• Define footlamberts (optional)
• Adjust LampLOC
• Adjust LampLOC
• Adjust LampLOC
• Adjust YNF screw for accurate green coordinates
• Recalibrate color
3-1

Advertisement

Table of Contents
loading

Table of Contents