2. Overview

The commissioning guide is for the PV controller in the ASC series.
There are a few steps to follow when the ASC is configured. During the planning of the commissioning job, it can be useful to check
whether the ASC is installed in the DEIF cabinet or in a customer-designed cabinet.
This document can be used in both cases.
The document contains the AGC terminal numbers even if installed in a switchboard. Please refer to the switchboard diagrams to
see the actual terminal block and terminal number. If in doubt, ask the switchboard designer.
ASC-4
2.1

Commissioning overview

Before commissioning starts, a work breakdown structure must be created. The work breakdown structure includes the necessary
planning from the start to the end of the commissioning and comprises of mechanical work, electrical DC work, electrical AC work
and so on.
This guide only focusses on the work breakdown structure concerning the ASC configuration.
Chapter
DEIF control system commissioning
2.2.1
Create IP list of all devices in the plant with IP addresses and adjust
Create list of power meters and inverters connected to the ASC with their ID numbers and baud rate and adjust
2.2.2
Create a complete list of the power source data
3
Configure all DPM from front face with CT ratio, PT ratio and relevant others
4
Establish communication with the ASC with PC Utility SW
4
Configure the application configuration
5
Wiring overview and parameters associated with the terminals
6
Configure AC configuration and scaling of the ASC
7
Configure power supply alarms
8.1
Configure settings for the breaker control and feedbacks PV breaker
8.2
Configure settings for the breaker control and feedbacks ESS breaker
8.3
Configure settings for the breaker feedbacks mains breaker
8.4
Configure input settings for breaker feedbacks
18.1
Configure multi-inputs 102,105,108
9
Configure generator values (nominal, power readings (P/Q) from input and scaling)
10
Configure mains values (power input (P/Q) and scaling)
11
Configure nominal values [U,I,f,P,S,Q,CT ratio, PT ratio] of the PV
12
Configure nominal values [U,I,f,P,S,Q,CT ratio, PT ratio] of the ESS
13.1
Configure DPM for mains incomer (number, ID and baud rate)
13.1
Configure DPM for generator (number, ID and baud rate
13.2
Configure DPM for PV (number, ID and baud rate)
13.3
Configure DPM for ESS (number, ID and baud rate)
13.1
Configure M-Logic with breaker feedbacks from MIC 4000 series
COMMISSIONING GUIDELINES 4189341077D EN
SW version 4.14 or later
Page 6 of 58