DANGER!
Commissioning is the most risky period of operation. Commissioning errors can lead to personal injury or death, or
equipment damage. These guidelines cannot anticipate or include every possible commissioning problem. Commissioning
must therefore be done thoughtfully, systematically and carefully by qualified and experienced personnel.
INFO
DEIF does not accept any responsibility for wiring errors.
INFO
The controllers interface to third party equipment. DEIF does not accept any responsibility for the operation of third party
equipment.
INFO
The commissioning guidelines provide information about checking third-party equipment, for example, the switchboard
wiring. This information is provided to help ensure a successful commissioning of the entire system. However, DEIF does
not accept any responsibility for the operation of third party equipment.
COMMISSIONING GUIDELINES 4189341077D EN
Page 5 of 58