Allied Telesis AT-FS980M/28DP Installation Manual page 63

Fast ethernet managed switches
Table of Contents

Advertisement

Figure 33. Installing an SFP Transceiver
4. If the transceiver is installed in the top slot, verify that the handle is in
the upright position, as shown in Figure 34. If the transceiver is
installed in the bottom slot, verify that the handle is in the down
position.
Figure 34. Positioning the SFP Handle in the Upright Position
5. Connect the fiber optic cable to the SFP module, as shown in Figure
35 on page 64.
FS980M Series Fast Ehternet Managed Switches Installation Guide
SFP Handle
63

Advertisement

Table of Contents
loading

Table of Contents