Chapter 2: Installing the Switch
54
6. Have another person hold the switch with the brackets at the wall
location where the switch is to be installed, while you use a pencil to
mark the wall with the locations of the four holes in the brackets. See
Figure 29.
Figure 29. Marking the Screw Hole Locations
7. Pre-drill the holes where you marked on the wall in Step 6.
8. Install the anchors into the holes.
9. Position the switch on the wall and drive screws through the holes to
attach the brackets on the wall. See Figure 30.
Figure 30. Driving the Screws through the Holes