Tire and Wheel Installation
WARNING
Use a torque wrench to assure proper torque.
Insufficient torque can cause stud breakage and
damage the wheel pilots. Over torque can stress
the bolts and strip the threads.
NOTE
The tire/wheel assembly is mounted with the valve stem
facing outward from Hub and Spindle.
IMPORTANT
Torque will drop after the first 10 hours of operation.
Check the Wheel Bolts for proper torque after this
interval and re-tighten them.
The Seeder uses 9.5L-15, 8 Ply Rating Tires and
should be inflated to 44 PSI.
Install a Tire and Wheel Assembly onto each Hub with
1/2-20 x 1 Wheel Bolts. Tighten Wheel Bolts to 50
Ft-Lbs. using the sequence in Figure 2-4. Then
tighten to a full torque of 80-85 Ft-Lbs.
1
3
5
6 BOLT
Figure 2-4: Tightening Sequence for 6-Bolt
F-1097-2305