4
Transporting the unit
4.1
Transport information
Prior to transporting the unit to the installation site, ensure that:
▪ The route has adequate load-bearing capacity; place rails or metal plates
underneath if necessary.
▪ Wall openings are large enough. By removing the packaging, the
passage width is reduced (see "Unit and connection data").
4.2
Transporting to the installation site
SAFETY INSTRUCTIONS
Risk of property damage and personnel injury from tipping equipment
a) Do not linger next to or behind raised equipment.
b) Move raised equipment carefully.
NOTICE
Risk of physical damage from improper transport
a) Transport the unit upright.
b) Do not tilt or stack the unit.
c) Pay attention to protruding parts when transporting the unpacked unit.
Transporting the unit on a pallet
a) Move the pallet truck under the pallet.
b) Raise the unit on the pallet.
Transporting the unit
Transport information
4
15