Equipotential bonding
Prerequisite
5
Setting up the unit
SAFETY INSTRUCTIONS
Risk of crushing from improper setup
a) Protect the unit and work area during setup and alignment.
CAUTION
Risk of fire from failure to observe applicable regional fire prevention
regulations
a) Observe applicable regional fire prevention regulations.
SAFETY INSTRUCTIONS
Risk of physical damage from overheating of the unit
a) Do not set up the unit close to heat sources.
The unit must be included in a potential equalisation system.
5.1
Place the unit on a work surface or base
SAFETY INSTRUCTIONS
Danger due to heavy weight of the unit (over 60 kg (132.3 lbs))
a) Erect the unit with several people.
b) Raise / lower the unit with suitable lifting equipment.
➢ Work surface / base must support the weight of the unit
➢ Work surface / base aligned horizontally
➢ Base erected according to the planning drawing (see "Planning
drawing").
a) Lift the unit.
b) Place the unit on the work surface or on the studs of the base frame.
WARNING
Risk of scalding due to spillage of hot cooked food
a) Attach sticker if the upper slide-in rails are higher than 1.60 m (5.2 ft).
Setting up the unit
Place the unit on a work surface or base
5
17