Payload Meter II
INITIAL SETUP OF PAYLOAD METER
There are several things that must be checked and
programmed when a Payload Meter is first installed.
1. Check the Switch Settings on the side of the
meter.
2. Check the Operator Check Mode settings
3. Check the Service Check Mode settings
4. Calibrate the clean truck.
The next few pages show the steps required to perform
these checks. Only after all of these steps have been
performed can the payload meter be released for
service.
Switch Settings
Figure 6-6.
Optional Equipment - Section 6
There are nine switches located behind the panel on
the left side of the payload meter. Figure 6-8 shows
the switch numbers. The following switch positions
should be confirmed before the meter is installed.
Switch
1
G
Gain - Do Not Adjust
t
B
Buzzer Volume - Do not Adjust
2
7
3
7
4*
4 - 685E
5 - 630E
B - 730E
C - 930E
D - 530M
E - 330M
F - 830E
5
DOWN
6
DOWN
7
DOWN - SHORT TONS
UP - METRIC TONS
8
UP
* Set switch 4 for the appropriate model.
Checking the Operator Check Mode
The Operator Check Mode is used to check and
change several settings. These should be checked
before the payload meter is put into service.
1. Press and hold the MODE
switch. The display will show.
2. Press the MODE switch once.
The display will show.
Refer to "Data All Clear" on Page 17 to clear the
haul cycle data.
3. Press the MODE switch once.
The display will show.
Refer to "Display of Fault Codes" on Page 19 for
viewing fault codes.
4. Press the MODE switch once.
The display will show.
This is the truck ID number. Refer to "Setting The
Machine ID" on Page 18 to change Machine ID.